0
Category

Webinar

Reviews

0 (0 Rating)

Course Description

Katılım Belgesi

Seminer tamamlandıktan sonra katılım belgesi aktif hale gelecektir. Bu seminer ücretsizdir fakat katılım belgesi almak isterseniz ücretlidir.


BANKA HAVALESİ İLE ÖDEME 

Near East Bank Hesap Numarası: 5010 - 600010955

Havale ile ödeme sırasında İsim – Soyisim ve E-mail adresinizi yazmanız zorunludur.

Ödeme yaptıktan sonra dekontunuzu İsim – Soyisim ve E-mail adresinizi  info.estudybox@neu.edu.tr adresine gönderiniz.

Course Curriculum

1 Proje Yönetimi


Instructor

Prof. Dr. Fahriye Altınay

0 Rating
0 Reviews
200 Students
6 Courses

She was born in Nicosia on March 26, 1982. She graduated from the Faculty of Communication in 1999. She completed her master's degree in educational technology in the field of educational sciences and distance education. In 2008, she completed her doctoral degree program on educational management at Near East University. Later, she completed her doctorate program in Educational Technology at Middlesex University in 2010. Fahriye ALTINAY has been lecturing on educational sciences, educational technologies, and material design since 2002. She is a full-time faculty member at Near East University. She lectures on doctoral degree, master's degree, and undergraduate degree programs. She works scientifically and executively on issues such as high education board, bi-communal cultures, and works on quality, strategic planning, accessible information, and smart society. Prof. Dr. Fahriye ALTINAY is the Co-Head of the Societal Research and Development Center affiliated with the Center of Excellence. She works as an editor and referee on international journals and books.

Student Feedback

Proje Yönetimi

0

Course Rating
0.00%
0.00%
0.00%
0.00%
0.00%

No Review found

Sign In or Sign Up as student to post a review

Reviews

Shopping Cart

Loading...